Back to Newsroom
05 May 2016 -

Managing VWPs in acQuire 4

Presenter: Caroline Ludemann, Rio Tinto

Rio Tinto’s Iron Ore group are using the acQuire 4 Monitoring Module to centralise storage of vibrating wire piezometer (VWP) construction information from our Pilbara operations. This presentation gives an overview of the project, and outlines some of the benefits that have been achieved.

Back to top